Estimate your pilot.

Model the sensor fleet, KRYTEK bridge network, deployment environment, duration and interval to get a fast preliminary hardware estimate.

1. SITES & SENSORS

Add each deployment site, then configure the sensor types, cost and quantity used at that site.

2. NETWORK BRIDGES

KRYTEK calculates the minimum bridge requirement from sensor count, site count and interval. You can still override it manually.

3. DEPLOYMENT ENVIRONMENT

Terrain and density influence expected radio conditions and how many relay points may be useful.
Medium
Open areaDense area
Set the deployment duration and interval for this environment.
30 min
1 min24 hr
Estimated power demand Medium
Hardware pricing

Main Bridge - $160 AUD
Mini Bridge - $80 AUD

Network configuration

Bridge requirements are calculated from the proposed site distribution, sensor fleet and network requirements. The recommended configuration represents the preliminary hardware requirement for the pilot.

Power provisioning

Power requirements are estimated from the proposed sensing interval and deployment duration. Provisioning is capped at $48 AUD per bridge for this estimate. Solar equipment, where required, is assessed separately.

Service & Deployment

Quoted separately
Deployment services are scoped following site review and may include planning, configuration, installation, commissioning and technical support.